# HHA internal — work for the Synchron route-purchase slice (not for Synchron) Moved out of the shared Synchron document on October 6, 2026, 2:41 PM ET. About 4 to 5 working days on HHA's side. | Change | Why | Estimate | | --- | --- | --- | | Register every issued trip number and never reuse it; separate staging and production ranges | Numbers are random and unique only among existing trips | 2–3 h | | Live connection for creating a purchase, signed with X-HHA headers, plus signed status reads | Only the mock exists | 1–1.5 days | | Handle item.in_progress, route.completed, item.fulfillment_failed with version numbers | Full-state events, may arrive out of order | 1 day | | Write route.completed links onto the permit, unlock the route, pass the route to the Factory for GPX and Hummer | How a paid route reaches the customer | included | | Send credit-paid routes to Synchron as $0 items | Credit routes never reach Synchron today | 0.5 day | | Document links valid 24 hours with SHA-256 | Synchron downloads permit documents later | 2–3 h | | Replace the CVV step with the 3-D Secure link (permit ordering phase) | Nash accepted saved card + 3-D Secure, pending CTO confirmation | 0.5 day | | Serve the Synchron callback and Checkout returns on heavyhaulagent.com | Nash chose heavyhaulagent.com; the workspace runs on heavyhaulgbt.com and the agent backend on heavyhaulagent.com | depends on hosting | | Placeholder values (1111 / XXXXX) for missing required fields on route purchases, and ignore 1111 when reading permits | Nash's fallback rule; 1111 already shows up as a misread permit weight | 2–3 h | | A staging copy of HHA | Synchron needs a staging address | depends on hosting |